West Wing Fast Facts:
• There were 97,000-PLUS square feet
involved in total construction.
• A total of 210 additional parking spaces were created.
• 1,346 10-yard truckloads of concrete were poured.
• A total of 741 tons of rebar were delivered and installed.
• The peak labor force was 131 workers.
• 8,000-plus-feet of copper wiring was installed.
• 337 new doors were installed.
• 1,200 tons of air conditioning were installed.
• 120 tons of cast iron pipe were used.
• 68 new toilets were installed.
• Due to weather, there were 37 days lost to construction.
• Some 9,000 4’x10’ sheets of gypsum drywall
boards were used.
• 576,000 drywall screws were used.
• A total of 255 pages of construction drawings were
used.
• There were 57 subcontracting firms.
• A total of 1,300 gallons of paint were used.
• There was one man-made lake constructed on the property
to slow runoff.
• A total of 235,050 bricks were laid.
• The thickest concrete wall was eight feet in the radiation
vault of the cancer center.
• The greatest depth pier poured was 69 feet and the
largest diameter pier is 48 inches.
• A total of 132 piers were poured.
• Some 1,500 electrical outlets were installed.
• More than a half million feet of electrical wire was
used.
|